Renovation of the front mansion in 1929. New built-in stairs were built from the first floor to the basement, with sauna facilities and home care. The access to these facilities took place before the outskirts.
The rear door of the house was replaced and a new terrace was built. On the top floor were rented bedrooms and the toilet was placed in a new place.